The Numerator 2.0

This blog will follow the design, manufacturing and competition of world's fastest calculator.

Tuesday, September 18, 2007

Frame Construction


The frame is almost rolling. Thanks to some members of the Baja team, the frame is starting to take shape. All of the lower members were tig welded up in the CAT Lab last night. The front axles will be turned either this evening or tomorrow morning. The Numerator 2.0 should be rolling by Friday!

0 Comments:

Post a Comment

<< Home